Broad Gauge Engines of the Great Western Railway: Part 2 : 1840-1845 Maximize

Broad Gauge Engines of the Great Western Railway: Part 2 : 1840-1845

In its first years of operation between 1838 and 1840, the Great Western Railway gained a deserved reputation for unreliability among the travelling public. Matters became so difficult that the railway was forced to suspend time-tabled operation in 1839, running trains only when sufficient locomotives and rolling stock were available.

FREE POSTAGE

More details

LIT N332

By buying this product you can collect up to 2 loyalty points. Your cart will total 2 points that can be converted into a voucher of £ 0.40.


Customers who bought this product also bought:

21 other products in the same category:

Previous
Next

OUT NOW!

No customer comments for the moment.

Write your review

Broad Gauge Engines of the Great Western Railway: Part 2 : 1840-1845

Broad Gauge Engines of the Great Western Railway: Part 2 : 1840-1845

In its first years of operation between 1838 and 1840, the Great Western Railway gained a deserved reputation for unreliability among the travelling public. Matters became so difficult that the railway was forced to suspend time-tabled operation in 1839, running trains only when sufficient locomotives and rolling stock were available.

FREE POSTAGE

Write your review